2 shot molding and over-molding put two materials into one part: a rigid substrate that carries the structure and a second shot that adds grip, sealing or colour. TCHD Mold builds these tools in-house for plastic, silicone and rubber injection, so the substrate, the second shot and the trial parts are handled as one project instead of two suppliers blaming each other.

What 2 shot molding and over-molding are used for
- Grip and hand feel — TPE or TPU over-moulded on ABS or PC for handles, housings and power tools.
- Sealing — a silicone or rubber lip over-moulded into a rigid housing replaces a separate gasket and a gluing step.
- Colour contrast — the second shot provides the accent colour without painting, pad printing or a second assembly.
- Fewer parts — over-molding removes screws, clips and adhesives from the bill of materials.
Over-mold and 2 shot tool specification
Every project is quoted against the part drawing, the two materials and the expected volume. The table below lists the parameters we work to on over-mold and two-shot tools.
| Product Name | Precision plastic tpe soft rubber/silicone Injection Molding Two Shot Molding Overmolding |
| Plastic Material | Advise clear plastic: PC, PMMA/Acrylic, PSU, PETG,etc… |
| Factory Certification | ISO9001:2015, SGS |
| Plastic Certification | RoSH, SGS, FDA food grade, Medical grade, UL, UV |
| Mold building time | Mostly 4-5 weeks, can be flexible to meet with your urgent delivery |
| Factory History | 21 years experience in plastic injection mold and clear/transparent plastic parts molding. |
| Surface Treatment | Texture, gloss, polishing, silk printing, painting, etc… |
| Production time | After sample is confirmed, 2-3 weeks for mass production |
| Production duration | 300000 shots to 1,000,000 Shots. |
| Equipment | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder, Plastic Injection Molding Machine from 80-1600T available. |
Tooling timing and quality approval
Most two-shot tools are built in 4 to 5 weeks, and the schedule can be compressed when a launch date is fixed. After the sample is confirmed, mass production takes 2 to 3 weeks, with a mould life of 300,000 to 1,000,000 shots depending on the steel and the second-shot material.
Tooling is machined on high-speed CNC, standard CNC, EDM, wire cutting and WEDM, with injection machines from 80 to 1600 tons available for trials and production. The factory holds ISO9001:2015 and SGS certification, and the plastics used carry RoHS, FDA food-grade, medical-grade, UL and UV approvals where the second shot touches skin, food or an outdoor surface.
Related capabilities
If the part needs a single-material tool first, our full service plastic injection molding page covers cavity, runner and gate options, and the injection molding process guide explains the stages a tool goes through before trial.
Request a 2 shot molding quote
Send the drawing, the substrate and second-shot materials, the target volume and any colour or texture requirement. Contact: jack, +86 13603037469, jack@runtooprecision.com. Shenzhen Tongchuang Huida Plastic Products Co., Ltd., Gongming Subdistrict, Guangming District, Shenzhen.

