2 Shot molding / Over-molding

OEM over molding OEM two shot mold Rubber injection/Silicone injection/plastic injection mold
Send Inquiry
Description

2 shot molding and over-molding put two materials into one part: a rigid substrate that carries the structure and a second shot that adds grip, sealing or colour. TCHD Mold builds these tools in-house for plastic, silicone and rubber injection, so the substrate, the second shot and the trial parts are handled as one project instead of two suppliers blaming each other.

2 shot molded part with a soft TPE over-mold on a rigid plastic substrate

What 2 shot molding and over-molding are used for

  • Grip and hand feel — TPE or TPU over-moulded on ABS or PC for handles, housings and power tools.
  • Sealing — a silicone or rubber lip over-moulded into a rigid housing replaces a separate gasket and a gluing step.
  • Colour contrast — the second shot provides the accent colour without painting, pad printing or a second assembly.
  • Fewer parts — over-molding removes screws, clips and adhesives from the bill of materials.

Over-mold and 2 shot tool specification

Every project is quoted against the part drawing, the two materials and the expected volume. The table below lists the parameters we work to on over-mold and two-shot tools.

Product Name Precision   plastic tpe soft rubber/silicone Injection Molding Two Shot Molding   Overmolding
Plastic Material Advise   clear plastic: PC, PMMA/Acrylic, PSU, PETG,etc…
Factory Certification ISO9001:2015,   SGS
Plastic Certification RoSH,   SGS, FDA food grade, Medical grade, UL, UV
Mold building time Mostly   4-5 weeks, can be flexible to meet with your urgent delivery
Factory History 21   years experience in plastic injection mold and clear/transparent plastic   parts molding.
Surface Treatment Texture,   gloss, polishing, silk printing, painting, etc…
Production time After   sample is confirmed, 2-3 weeks for mass production
Production duration 300000   shots to 1,000,000 Shots.
Equipment High   speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder, Plastic Injection   Molding Machine from 80-1600T available.

Tooling timing and quality approval

Most two-shot tools are built in 4 to 5 weeks, and the schedule can be compressed when a launch date is fixed. After the sample is confirmed, mass production takes 2 to 3 weeks, with a mould life of 300,000 to 1,000,000 shots depending on the steel and the second-shot material.

Tooling is machined on high-speed CNC, standard CNC, EDM, wire cutting and WEDM, with injection machines from 80 to 1600 tons available for trials and production. The factory holds ISO9001:2015 and SGS certification, and the plastics used carry RoHS, FDA food-grade, medical-grade, UL and UV approvals where the second shot touches skin, food or an outdoor surface.

Related capabilities

If the part needs a single-material tool first, our full service plastic injection molding page covers cavity, runner and gate options, and the injection molding process guide explains the stages a tool goes through before trial.

Request a 2 shot molding quote

Send the drawing, the substrate and second-shot materials, the target volume and any colour or texture requirement. Contact: jack, +86 13603037469, jack@runtooprecision.com. Shenzhen Tongchuang Huida Plastic Products Co., Ltd., Gongming Subdistrict, Guangming District, Shenzhen.